Auxiliary feedwater system risk-based inspection guide for the Turkey Point Nuclear Power Plant
Read Online
Share

Auxiliary feedwater system risk-based inspection guide for the Turkey Point Nuclear Power Plant

  • 380 Want to read
  • ·
  • 32 Currently reading

Published by Supt. of Docs., U.S. G.P.O. [distributor] .
Written in English


Book details:

The Physical Object
FormatUnknown Binding
ID Numbers
Open LibraryOL10109607M
ISBN 100160366496
ISBN 109780160366499
OCLC/WorldCa29123120

Download Auxiliary feedwater system risk-based inspection guide for the Turkey Point Nuclear Power Plant

PDF EPUB FB2 MOBI RTF

@article{osti_, title = {Auxiliary feedwater system risk-based inspection guide for the North Anna nuclear power plants}, author = {Nickolaus, J R and Moffitt, N E and Gore, B F and Vo, T V}, abstractNote = {In a study sponsored by the US Nuclear regulatory Commission (NRC), Pacific Northwest Laboratory has developed and applied a methodology for deriving plant-specific risk-based. Auxiliary feedwater system risk-based inspection guide for the Byron and Braidwood nuclear power plants. Auxiliary feedwater system risk-based inspection guide for the Turkey Point nuclear power plant and applied a methodology for deriving plant-specific risk-based inspection guidance for the. Auxiliary feedwater system risk-based inspection guide for the H. B. Robinson nuclear power plant. Auxiliary feedwater system risk-based inspection guide for the Turkey Point nuclear power plant.

"NRC REQUIREMENTS FOR AUXILIARY FEEDWATER SYSTEMS AT INDIAN POINT NO. 2 NUCLEAR POWER PLANT" (November 7, ) Consolidated Edison Company of New York, Inc. Indian Point Unit No. 2 Docket December, I9o. PDF | Per NRC to perform a PRA, analysts go through many steps: 1. First, they specify the hazard—the outcome(s) to be prevented or reduced. | Find, read and cite all the research you need on. The IAEA Code on the Safety of Nuclear Power Plants: Design (Ref. [3], p. 43) and the associated Safety Guide on General Design Safety Principles of Nuclear Power Plants (Ref. [4], pp. 28 and 29) present the safety principles and design approaches relating to equipment qualification (EQ). Requirements for implementing EQ in. MFW Main feedwater MI Maintenance test-inspection MOV Motor-operated valve MOVATS Motor Operated Valve Analysis and Test System"™ MSIS Main steam isolation signal MSLB Main steam line break MSSV Main steam safety valve NPAR Nuclear Plant Aging Research NPE Nuclear Power Experience, Stoller Power, Inc.

A three-loop Westinghouse plant has three steam generators, three reactor coolant pumps, and a pressurizer. The three-loop units in the United Stat es are Beaver Valley 1 a nd 2, Farley 1 and 2, H. B. Robinson 2, North Anna 1 and 2, Shearon Harris 1, V. C. Summer, Surry 1 and 2, and Turkey Point 3 and 4. Each of these plants has fuel. The Florida Power & Light Company’s Turkey Point Nuclear Generating Station about 20 miles south of Miami has two Westinghouse pressurized water reactors that began operating in the early s. Built next to two fossil-fired generating units, Units 3 and 4 each add about megawatts of nuclear-generated electricity to the power grid. T. V. Vo's 59 research works with 60 citations and reads, including: Reliability Analysis in Support of Risk Assessment for Hydroelectric Generating Stations.   As Florida Power and Light finalized plans to expand its nuclear reactors at Turkey Point three years ago, critics were aghast. The nuclear plant already sits at a .